Cost of developing design documentation and timing
PRICES OF DESIGN WORK:
Cost of designing a residential building:
-
more than 5000 m2 - price 48,230 sum/square meter
-
up to 5000 m2 - price 75,815 sum/square meter
-
up to 1000 m2 price from 96,491 sum/square meter
-
up to 200 m2 price from 124,060 sum/square meter
-
Completion time averaged from 2 months
Cost of designing an industrial facility:
-
price from 82707 sum/m2. Completion times are averaged from 3 months.
Cost of designing an office or administrative building:
-
price from 41353 sum/m2 - from 2 months
Cost of designing social facilities (schools, kindergartens, Houses of Culture, canteens, etc.):
-
price from 68922 sum/m2 - from 2 months
Cost of designing a gas station:
price 200,000,000 sum. from 3 months
If you have questions about your property, call us or request a free call back and we will call you back.
Cost of designing a warehouse facility:
-
more than 5000 m2 - price 48245 sum/ square meter
-
up to 5000 m2 - price 62030 sum/ square meter
-
up to 1000 m2 price from 75815 sum/square meter
-
up to 200 m2 price from 88221 sum/square meter
-
Completion time averaged from 1.5 months
Prices for inspection of buildings and structures:
-
Visual - from 8000 sum/m2
-
Detailed - from 12,400 sum/m2
-
Survey prices:
-
Engineering and geological surveys - from 413,536 soums per m.p. wells - from 2 weeks.
-
Engineering and geodetic surveys - from 2,067,682 soums per hectare of area - from 1 week.
-
Engineering and environmental surveys - from 13,784,547. - from 3 weeks.